New House: Day 146

Things are really picking up now:

  • Grout done
  • Counter installed
  • Plumbing fixtures installed (and toilets)
  • Floor boards (trim) installed
  • Outside lights installed
  • All concrete poured
  • A/C and water heater installed
  • Sprinkler system starting
  • Most electric done
  • Closet wire hangers 90% done